Construction of the South bay of the paint coating plant

Construction of the South bay of the paint coating plant

Client: OAO «Research and production corporation «Uralvagonzavod»

Construction of a building of 22,000 sq.m of the total area, shop’s bays length – 630 m.

Jobs:

  • multilevel concrete foundations for equipment of 9,000 sq.m.
  • laying of the outside pipeline, installation of the outside compressed air pipeline (d=420 mm).
  • cable routing (power 6 kW),
  • Installation of switchgears (2 pcs.), transformer substations (4 pcs.).
  • replacing of underground and ground pipelines of a total length of 12,000 m.
  • installation of steel structures (1,154 mt)
  • interior works with the bays under refurbishment
  • rehabilitation

Installation of equipment:

  • 20 painting and curing chambers by GALATEK (Czech Republic),
  • a shot blaster complex by BLASTMAN (Finland),
  • 3 gas treatment plants by KRAFT (Germany),
  • 4 compressor plants of 40 000 sq.m /hour