Главная Поиск Версия для печати рус | en
Трест 88

Modernization of the large diameter reinforced concrete nonpressure pipe plant (2007-2008)

Modernization of the large diameter reinforced concrete nonpressure pipe plant (2007-2008)

Client: Concrete product plant №2.

Jobs: Replacement of the heat supply network of pipes (d=273), installation of the constructional part of the main elements of a building made of preassembled reinforced concrete blocks and metal structures.



<<